Sharp Daily
No Result
View All Result
Saturday, December 20, 2025
  • Home
  • News
    • Politics
  • Business
    • Banking
  • Investments
  • Technology
  • Startups
  • Real Estate
  • Features
  • Appointments
  • About Us
    • Meet The Team
Sharp Daily
  • Home
  • News
    • Politics
  • Business
    • Banking
  • Investments
  • Technology
  • Startups
  • Real Estate
  • Features
  • Appointments
  • About Us
    • Meet The Team
No Result
View All Result
Sharp Daily
No Result
View All Result
Home Real Estate

Step to step guide on how to construct a cabro roads

Solomon Kimani by Solomon Kimani
July 31, 2024
in Real Estate
Reading Time: 2 mins read

The methodology for road construction typically follows a standard procedure, with variations depending on the specific finish required for the final two layers. Many residential projects prefer to finish their roads and parking spaces using concrete paving blocks, commonly known as cabro.

The first step involves marking out the chainages along the road and simultaneously marking the road levels at the specific chainage points. This process ensures proper alignment and gradient control throughout the construction.

Once the layout is confirmed, excavation is carried out to remove any unwanted material or soil in the subgrade layer. The next step is to backfill the area with the recommended soil type. At this stage, the desired slope and levels are established, requiring a surveyor to be present to guide plant operators accurately. Compaction is then performed using a 20-tonne smooth roller, which makes 8-10 passes to achieve the specified maximum dry density (MDD).

Following compaction, Proctor tests are conducted to verify that the soil meets the required standards. Upon receiving satisfactory test results, the next phase of the project can proceed: hard-core layering. This step involves placing layers of hard-core stones, typically hand-packed, in two 150mm layers. After the first layer is compacted, the second layer is added and compacted similarly. Quarry dust is then spread to fill the spaces between the stones, and a half-tonne roller is used to ensure the dust settles completely.

RELATEDPOSTS

No Content Available

A blinding layer of 50mm quarry dust is then applied over the compacted hard-core, providing a smooth base for the final paving. Finally, 60mm cabro blocks are laid on top, and quarry dust is added to fill any small voids between the blocks. The road surface is compacted using a steel plate compactor to ensure a level and stable finish. This meticulous process ensures a durable and aesthetically pleasing road surface that meets the specified standards and requirements.

Previous Post

The role of fintech in expanding pension savings

Next Post

NCBA Group scraps monthly fees on retail accounts

Solomon Kimani

Solomon Kimani

Related Posts

Analysis

In duplum rule Kenya: slain lawyer Mathew Kyalo Mbobu wins posthumous victory against Sh69M predatory loan demand.

December 3, 2025
Money

World bank raises Kenya’s 2025 growth forecast as construction sector rebounds

November 25, 2025
Analysis

Growing Appeal of Alternative Investments in Africa

November 21, 2025
Crime

Why urban Kenyans are turning to micro-homes and co-living spaces

November 5, 2025
Real Estate

Kenya’s industrial real estate awakening

October 16, 2025
Real Estate

What’s driving cost escalation in construction and how to mitigate

September 26, 2025

LATEST STORIES

1049795356

The Impact of Interest Rates, Inflation, and Exchange Rates on Kenyan Pension Schemes

December 20, 2025

Are Pension Funds in Kenya Too Conservative for a Growing Economy?

December 19, 2025

Are We Saving or Just Surviving? The New Meaning of Savings

December 19, 2025

Should Kenya’s National Infrastructure Fund Be a Corporate Entity?

December 19, 2025

Why Cash Still Matters in a Digital Money World

December 19, 2025

Is Government a Facilitator or an Investor? Rethinking the State’s Role in Economic Development

December 19, 2025

Tala’s USDC Credit Plan Signals a New Era for Blockchain-Based Lending

December 19, 2025

Health Insurance Fraud in Kenya: Why Insurers Must Rethink Their Risk Management Approach

December 19, 2025
  • About Us
  • Meet The Team
  • Careers
  • Privacy Policy
  • Terms and Conditions
Email us: editor@thesharpdaily.com

Sharp Daily © 2024

No Result
View All Result
  • Home
  • News
    • Politics
  • Business
    • Banking
  • Investments
  • Technology
  • Startups
  • Real Estate
  • Features
  • Appointments
  • About Us
    • Meet The Team

Sharp Daily © 2024